New re-plan

Enter when the measurements were taken and how long before the new plan can actually be applied. The next step shows what the current plan predicts for each state, so you only change what you measured.

Times here are post-induction (PI), not elapsed fermentation time (EFT). If your reading is in EFT, subtract the time induction began – with induction at 7 h, an EFT of 30 h is a PI of 23 h.
The plant keeps running the current plan for this long.
Advanced
Model config
/app/baseline/model_calibration.yaml
Calibrated parameters
/app/baseline/calibration
Re-planning from
/app/baseline/prev_run
Solver iteration cap
200